🧱 Concrete Calculator

Work out how much concrete you need for a slab, footing or post hole – in cubic yards, cubic meters and bags of premix.

Quick answer: Volume = length × width × thickness. A 10 × 10 ft slab 4 inches thick holds 33.33 cubic feet – about 1.23 cubic yards (0.94 m³) – which is 56 bags of 80 lb premix.

Updated · Free · No sign-up · Works on any device

Concrete Calculator inputs

More options
%
Many contractors add 5–10%.

Result

Concrete needed

1.23 yd³

33.33 cubic feet · 0.944 m³

Cubic yards1.23
Cubic meters0.944
Cubic feet33.33
40 lb bags of premix112
60 lb bags of premix75
80 lb bags of premix56
25 kg bags of premix79

Premixed bags vs ready-mix

Bag sizeApprox. yieldBags needed
40 lb bag0.3 ft³112
60 lb bag0.45 ft³75
80 lb bag0.6 ft³56
25 kg bag0.012 m³79

Above roughly 1 cubic yard (0.76 m³), ordering ready-mix concrete by truck is usually cheaper and easier than mixing bags.

How to calculate concrete volume

Concrete is ordered by volume. Convert every measurement to the same unit, multiply to get the volume, then convert to cubic yards (US ready-mix) or cubic meters.

Slab = length × width × thickness  ·  Column = π × (diameter ÷ 2)² × height  ·  1 yd³ = 27 ft³

Worked example

A 10 × 10 ft patio slab 4 inches thick: 4 in = 0.333 ft, so the volume is 10 × 10 × 0.333 = 33.33 ft³. Divide by 27 for 1.23 cubic yards (0.94 m³). At 0.6 ft³ per 80 lb bag that is 55.6 – round up to 56 bags.

Bag yields

BagYieldBags per cubic yard
40 lb0.30 ft³90
60 lb0.45 ft³60
80 lb0.60 ft³45
25 kg0.012 m³about 64

Shapes supported

  • Slab: length and width in feet or meters, thickness in inches or centimeters.
  • Wall footing: a continuous strip – length in feet/meters, width and depth in inches/centimeters.
  • Round column or post hole: diameter in inches/centimeters and height in feet/meters.

Tips for pouring

  • Compact the sub-base and use gravel under slabs to prevent cracking.
  • For more than about a cubic yard, ready-mix delivery saves hours of hand mixing.
  • Add control joints every 8–12 ft in slabs to direct shrinkage cracks.
  • Keep fresh concrete damp for several days so it cures to full strength.

Cubic yards versus cubic meters

US ready-mix suppliers sell concrete by the cubic yard, while most other countries use cubic meters. One cubic yard is about 0.765 m³, and one cubic meter is about 1.31 cubic yards, so always confirm which unit your supplier quotes.

Frequently asked questions

How many bags of concrete make a yard?

One cubic yard is 27 cubic feet. An 80 lb bag yields about 0.6 cu ft, so you need 45 bags; with 60 lb bags (0.45 cu ft) you need 60, and with 40 lb bags (0.3 cu ft) 90.

How thick should a concrete slab be?

Four inches (10 cm) is standard for patios, walkways and shed bases. Driveways and garage floors are usually 5–6 inches (12–15 cm), thicker where heavy vehicles park.

Should I order extra concrete?

Yes. Uneven ground, form bulges and spillage use more than the theoretical volume. Add 5–10% under advanced options – running short mid-pour leaves a weak cold joint.

How do I calculate concrete for a post hole?

Choose the round column shape and enter the hole diameter and depth. Subtract the post itself if it is large: a 4 × 4 post displaces about 0.11 cu ft per foot of depth.