Concrete Calculator
Measure the slab, footing or post holes and get the volume to order from a ready-mix plant in cubic yards or cubic metres, the number of 40, 60, 80 lb or 25 kg premix bags for a small job – or, if you are mixing on site, the 50 kg cement bags, sand and gravel for a 1:2:4 or leaner mix.
Quick answer: Volume = length × width × thickness. A 10 × 10 ft slab 4 inches thick holds 33.33 cubic feet – 1.23 cubic yards (0.944 m³) – which is 56 bags of 80 lb premix at 0.6 cu ft per bag. In metric, every cubic metre takes about 84 bags of 25 kg premix, or 6.34 bags of 50 kg cement in a 1:2:4 site mix.
Not rated yet · Updated · Free · No sign-up
Concrete Calculator inputs
Result
Concrete needed
1.23 yd³
33.33 cubic feet · 0.944 m³
| Cubic yards | 1.23 |
| Cubic meters | 0.944 |
| Cubic feet | 33.33 |
| 40 lb bags of premix | 112 |
| 60 lb bags of premix | 75 |
| 80 lb bags of premix | 56 |
| 25 kg bags of premix | 79 |
Calculated with CalcBright – https://calcbright.com/concrete-calculator on
Premixed bags vs ready-mix
| Bag size | Approx. yield | Bags needed |
|---|---|---|
| 40 lb bag | 0.3 ft³ | 112 |
| 60 lb bag | 0.45 ft³ | 75 |
| 80 lb bag | 0.6 ft³ | 56 |
| 25 kg bag | 0.012 m³ | 79 |
Above roughly 1 cubic yard (0.76 m³), ordering ready-mix concrete by truck is usually cheaper and easier than mixing bags.
How the volume is worked out
Concrete is bought by volume, so every job comes down to one number: how many cubic yards or cubic metres fill the form. The only trap is units – length and width are measured in feet or metres, but thickness is measured in inches or centimetres, and they have to be converted to the same unit before you multiply.
Slab or footing = length × width × thickness · Round hole = π × (diameter ÷ 2)² × depth · Order = volume × quantity × (1 + waste %)
The calculator converts everything to cubic metres internally, then reports cubic yards (27 cu ft, exactly 0.764555 m³), cubic feet and the bag counts, rounded up to whole bags.
Three worked examples
A US driveway. A 24 × 20 ft driveway poured 5 inches thick: 5 in is 0.4167 ft, so 24 × 20 × 0.4167 = 200 cu ft, or 7.41 cubic yards. With 10% extra the order becomes 8.15 cubic yards (6.23 m³). In 80 lb bags that would be 367 bags – nobody mixes that by hand, so this is a ready-mix order.
A boundary-wall footing mixed on site. A 20 m strip footing, 60 cm wide and 30 cm deep, is 20 × 0.6 × 0.3 = 3.6 m³; with 5% extra, 3.78 m³. Choosing the 1:2:4 site mix gives 1,198 kg of cement – 23.95, so 24 bags of 50 kg – plus 1.66 m³ of sand and 3.33 m³ of coarse aggregate. Ask the supplier to deliver aggregate by the cubic metre and keep the sand covered so it stays clean.
Blinding under foundations. Before the reinforced footings of a villa go in, the excavated area is usually sealed with a thin lean layer called blinding. A 12 × 10 m area at 5 cm with 5% extra is 6.3 m³; at 1:4:8 that is 1,075 kg of cement (22 bags of 50 kg), 2.985 m³ of sand and 5.97 m³ of aggregate.
Bags per cubic yard and per cubic metre
| Bag | Yield per bag | Per cubic yard | Per cubic metre |
|---|---|---|---|
| 40 lb premix | 0.30 cu ft | 90 | 118 |
| 60 lb premix | 0.45 cu ft | 60 | 79 |
| 80 lb premix | 0.60 cu ft | 45 | 59 |
| 25 kg premix | 0.012 m³ | 64 | 84 |
For site mixing, these are the quantities per cubic metre of finished concrete with the 1.54 dry-volume rule:
| Mix (cement : sand : stone) | Typical use | Cement | 50 kg bags | Sand | Stone |
|---|---|---|---|---|---|
| 1 : 1.5 : 3 | strong slabs, small footings | 403 kg | 8.06 | 0.42 m³ | 0.84 m³ |
| 1 : 2 : 4 | general purpose | 317 kg | 6.34 | 0.44 m³ | 0.88 m³ |
| 1 : 3 : 6 | mass concrete, bases | 222 kg | 4.44 | 0.46 m³ | 0.92 m³ |
| 1 : 4 : 8 | lean concrete, blinding | 171 kg | 3.41 | 0.47 m³ | 0.95 m³ |
What changes the amount
- Thickness. It drives the result more than anything else: the same 10 × 10 ft slab needs 1.23 cubic yards at 4 inches and 1.85 at 6 inches – 50% more for 2 extra inches. Measure the depth of the form in several places, not just at the edge.
- The base. A dip of 1 inch across a 10 × 10 ft area swallows another 8.3 cu ft. Level and compact the sub-base first; it is cheaper than filling hollows with concrete.
- Posts and pipes. Anything set into the concrete takes up room: a 4 × 4 post is 3½ in square, about 0.085 cu ft per foot of depth.
- Bag brand. 25 kg bags yield between 0.010 and 0.012 m³ depending on the product, so the same cubic metre can need 84 or 100 bags.
- Mix ratio. Richer mixes need more cement and less sand and stone per cubic metre, as the table shows.
Common mistakes
- Typing the thickness in feet or metres when the field asks for inches or centimetres – 0.33 (feet) in the inches box makes the slab 12 times too thin.
- Ordering the exact theoretical volume. Running short mid-pour leaves a weak cold joint; add 5–10%.
- Mixing up a 94 lb US cement bag with a 50 kg bag. The US bag is 42.6 kg, so a 1:2:4 cubic metre takes 7.43 of them instead of 6.34.
- Confusing a premix bag with a cement bag. Premix already contains sand and gravel; a bag of cement does not, and 50 kg of cement on its own makes far more than 25 kg of premix.
- Pouring control joints too far apart. The usual guide is 2–3 times the slab thickness in inches, in feet – so every 8–12 ft for a 4-inch slab – cut to a quarter of the slab depth.
Hot weather and curing
In a Gulf summer, fresh concrete loses water fast, which weakens the surface and causes plastic cracking. The American Concrete Institute’s hot-weather guide recommends planning around this: pour early in the morning, dampen the base and forms, have the finishing crew ready, and start curing as soon as the surface allows. Keep slabs moist or covered for at least the first 7 days, the curing period ACI uses for ordinary concrete.
When to get professional help
The figures here are quantities, not a design. Anything that carries a building – footings, columns, beams, suspended slabs, retaining walls – needs an engineer’s drawings and the mix strength, reinforcement and cover they specify, and the nominal site mixes above should not replace an approved mix design or a ready-mix plant’s certified grade. Check with your municipality whether the work needs a permit before you dig. For patios, paths, post holes and garden slabs, the calculator, a level base and 5–10% spare are all you need.
Frequently asked questions
How many bags of concrete make a cubic yard?
A cubic yard is 27 cubic feet. An 80 lb bag yields about 0.60 cu ft, so it takes 45 bags; 60 lb bags (0.45 cu ft) take 60 and 40 lb bags (0.30 cu ft) take 90. Buy a few spare – the yield printed on the bag is approximate.
How much concrete do I need for a 10 × 10 slab?
At 4 inches thick, 33.33 cu ft – 1.23 cubic yards or 56 bags of 80 lb mix. At 6 inches it is 50 cu ft – 1.85 cubic yards or 84 bags of 80 lb mix – which is the point where a short ready-mix load usually makes more sense than bags.
How many 25 kg bags of concrete are in a cubic metre?
About 84 if the bag yields 0.012 m³, which is what the calculator assumes. Brands differ: a bag that yields 0.011 m³ needs 91 per cubic metre and one that yields 0.010 m³ needs 100, so check the yield on the data sheet before you buy.
How many 50 kg bags of cement are needed for 1 m³ of concrete?
With the site rule of 1.54 m³ of dry material per m³ of concrete and cement at 1,440 kg/m³, a 1:2:4 mix needs 316.8 kg – 6.34 bags (buy 7). A stronger 1:1.5:3 mix needs 8.06 bags, a 1:3:6 mix 4.44 and a lean 1:4:8 blinding mix 3.41.
How thick should a concrete slab be?
The US International Residential Code (R506.1) sets 3½ inches (89 mm) as the minimum for a slab-on-ground floor. Patios and paths are usually poured at 4 inches (10 cm); driveways and garage floors at 5–6 inches (12–15 cm).
How much extra concrete should I order?
Most contractors add 5–10% for an uneven base, form bulges and spillage. On the 24 × 20 ft, 5-inch driveway, 10% turns 7.41 cubic yards into 8.15 – far cheaper than a second short-load delivery or a cold joint where the first pour has started to set.
How do I work out concrete for fence post holes?
Choose “Round column / post hole”, enter the hole diameter, depth and number of holes. Twelve 10-inch holes 3 ft deep with 10% extra take 0.80 cubic yards – 36 bags of 80 lb mix. A 4 × 4 post (3½ × 3½ in actual) takes up about 0.085 cu ft per foot of depth, so you can subtract that.
How do I convert cubic metres to cubic yards?
One cubic yard is exactly 0.764555 m³ (0.9144 m cubed), so multiply cubic metres by 1.308 to get cubic yards, or cubic yards by 0.7646 to get m³. US plants quote in yards; plants in the Gulf, Europe and most other countries quote in cubic metres.
What changed
- – Page fully reviewed: site-mix option added (50 kg and 94 lb cement bags, sand and gravel for 1:1.5:3, 1:2:4, 1:3:6 and 1:4:8 mixes); bag yields checked against manufacturer data sheets; post-displacement figure corrected to 0.085 cu ft per foot for a 3½ × 3½ in post; new worked examples, tables and sources.
Sources
- QUIKRETE Concrete Mix No. 1101 – product data sheet (80, 60 and 40 lb yields)
- Firth CivilCrete 25 kg – technical data sheet (0.012 m³ per bag)
- Heidelberg Materials – Multipurpose Concrete 25 kg (≈ 0.011 m³ per bag)
- International Residential Code, Section R506.1 – Concrete floors on ground (International Code Council)
- ACI 302.1R-15 – Guide to Concrete Floor and Slab Construction (American Concrete Institute)
- ACI 305R-20 – Guide to Hot Weather Concreting (American Concrete Institute)
- FHWA – Curing of concrete pavements (ACI 308 curing periods)
- NIST Handbook 44, Appendix C – yard = 0.9144 m exactly
Last reviewed: ·
Reviewed by Chelsea, CalcBright's animated guide, for the CalcBright editorial team · How we check our numbers
Rate the Concrete Calculator
Only the average star rating is shown. Error reports go straight to our inbox so we can check and fix them. See our Methodology and privacy policy.